学海网 文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 工程科技 > FAI_checklist

FAI_checklist

手机产品FAI check list

FIRST ARTICLE INSPECTION [FAI] CHECK LIST Model / Part No.____________________________ Serial No.________________, ________________ Work Order No. _________________ Date _______________ Check Item 檢查項目 1.0 Assembly / Cosmetic / Packing Inspection 組裝 / 外觀 / 包裝檢驗 1.1 1.2 Ensure all accessories are correct, per BOM 依照BOM表核對所有附件是正確的 Ensure that all artwork / texts on gift box are matched with product contents and the accessory contents on user manual, quick start guide and gift box artwork are matched with the accessory in the gift box. 核對產品文件與說明文件之產品內容物與實際出貨之包裝內容物相符. 並確認User manual, Quick start guide 和彩盒上所列之配件需與彩盒中之配件相符. a. Verify that all Agency/ Compliance labels (e.g. FCC ID,CE Mark ) are correct. If the content or code need to generate by calculation, please make sure the result is correct. (Suggest to calculate 3devices) 核對產品與包裝上之標籤與文字內容沒有錯誤. 若標籤上有特定內容or編碼需經過計算而產生, 需確認其演算結果無誤. (建議演算3台) b. Check SAR values are the same among label plan, gift box and user guide. 確認 Label plan, 彩盒 及 說明書 上的 SAR 值一致 1.4 1.5 1.6 1.7 1.8 Examine internal packaging layout / pack materials fit well inside shipping box. 檢驗包裝內部之內含物位置是否正確,包裝材料與包裝方式是否正確 Verify S/N Label is clearly printed. (including cartons) 核對外包裝與內包裝箱之序號條碼印刷是否清楚 Verify Barcode Labels can be scanned ( use barcode reader for accuracy check ). 檢查Bar Code Label上之條碼是否可刷進 Verify contents of service kit. 核對Service Kit之內容物是否正確 Check SKU packages double taping requisition (Ref doc: QEN EN-00014593) with PAM for the SKU with new customer; double taping conditions with "Checking by project"; the concerns of team members about the double taping conditions of QEN EN-00014593. 請依據QEN (EN-00014593) 確認label 覆貼之狀況. 如果內容提及"checking by project" 或為新客戶或 team member 對 於QEN 內容提出疑慮, 請與 PAM 再度確認覆貼之狀況. 確認機台與彩盒無沾汙問題(請參考QR包裝測試 or 追溯PQV測試狀況) Make sure there is no stain issue on the unit caused by gift box interference. (pls. refer to package test at QR or track back PQV's test result) Hardware/Software Verification 軟硬體驗證 Doc. No./ Ver 文件編號 /版本 Verification Result MFG CDIT PAM Comments 其他建議

1.3

1.9

2.0 2.1

Install each product-specific option kit as documented per kit. 對於產品文件上所標示之產品標準配備,都要實際安裝執行 2.2 Check SIM Lock / Unlock 確認 SIM Lock/Unlock a. Put non-customer SIM card into UUT under OS. Verify the SIM is locked by UUT. Then input the unlock code into UUT and verify device is unlocked with the SI

M at once. 進入OS先放入非客戶SIM card確定可以SIM Lock後,再將取得之SIM unlock code輸入機台中,以確認SIM lock 功能可 以順利一次即解開。 b. Send back the UUT passed item “a” to production line D/C station, redo the SIM lock activity. Again, we put the noncustomer SIM card and verify UUT was SIM locked. 將a.項之機台再次過D/C 後,再次放入非客戶SIM card確定可以SIM Lock c. Replace the SIM card with customer SIM into UUT under OS. Verify the SIM is unlocked and function is correct. 確認b.項功能無誤後,再次放入客戶SIM card確定SIM unlock功能正確。 Check Language 檢查語言版本 Check OS / Radio / ExtROM Version 檢查軟體版本 Check Bootloader version 檢查Bootloader之內容版本 2.6 Check the CID code. (Please refer to PDM) 確認CID碼是否正確 ( 請參考PDM) 2.7 Check the MCC_MNC, NSL. (Please refer to PDM) 確認MCC_MNC, NSL是否正確 (請參考PDM) 2.8 Check the WLAN Country code (Please refer to PDM) 確認WLAN Country code是否正確 (請參考PDM) 2.9 Check the MID code. 確認MID碼是否正確 2.10 Check the PRL code. 確認PRL碼是否正確 2.11 Check the ROM/RAM/CPU/resolution or color is matched with the content in device information. 確認ROM/RAM/CPU/解析度or 顏色與機台之裝置資訊符合 2.12 For CPU 8X60 series, check Security status under HBOOT mode (S-ON is correct) 針對 CPU 8X60系列, 在HBOOT畫面上方確認 Security 是否開啟(S-ON 為正確) 2.3 2.4 2.5

FAI Check List, page 1, total 2 pages

IW-00000003-01-R25

FAI_checklist

第1页

TOP相关主题

  • checklist
  • check list
  • checklist模板
  • 项目checklist模板
  • checklist表格
  • check list是什么意思
  • checklist是什么意思
  • 英国签证checklist

我要评论

相关文档

  • AS9102 Checklist Template

    First Article Inspection – Guidance Checklist SUPPLIER NAME PREPARED BY DATE...of Conformity Yes No PART NUMBER ORDER NUMBER DRAWING ISSUE FAI/ SERIAL No...

  • 新机种C0~C6阶段结转Checklist

    鎰生電線塑料(昆山)有限公司新機種C0~C6階段Checklist 開會日期: 客戶: Item ...射出3PCS提供三次元测量 FAI全尺寸,工程提供表球标的2D图纸给三 次元 C3 4 ...

  • Project checklist_V1.0

    Project checklist_V1.0_机械/仪表_工程科技_专业资料。Project checklist_V1...(样品承认书) FAI/MR报告 样品验证总结报告 内部2D、3D图档 SOP FlowChart ...

  • Reference Guide for Defining FAI (PPAP) Requirements Form_ ...

    Reference Guide for Defining FAI (PPAP) Requirements Form_电子/电路_工程科技_专业资料。FAI/PPAP ChecklistReference Guide for Defining FAI/PPAP Requirements ...

  • SQRC- CheckList_图文

    SQRC- CheckList_生产/经营管理_经管营销_专业资料。SQRC- CheckList ...(FAI) Overall process PFMEA Process Flow chart (included QC engineering ...

  • Dell_QPA_Audit_Checklist_scoring_final

    Dell_QPA_Audit_Checklist_scoring_final_理学_高等教育_教育专区。Process Qualification...在量產階段,是否有程序來實施FAI? Is there the reliability test for the...

  • FAI CHECK LIST

    FAI CHECK LIST_机械/仪表_工程科技_专业资料。dFAI Checklist / FAI 文件清单 文件清单 PO: Part Name: NO. 序号 1 2 3 4 5 6 7 8 9 10 11 12 13...

  • FAI评审流程说明

    FAI评审的启动 ? 贵司准备好样品和文档后,发<不合格项清单>和 <质量控制检验CHECKLIST>的电子件给物料对 应的华为TQC人员,我们即认为供应商提出FAI 评审申请,...

  • Checkpoint MONO Line Qualification Checklist Rev 1

    FAI QC GR&R iron PM checklist rework TQCI rework TQCI TQCI TQCI TQCI TQCI TQCI iron PM checklist rework TQCI rework TQCI TQCI TQCI TQCI IPC...

  • CISCO Audit Checklist (1)

    CISCO Audit Checklist (1)_经管营销_专业资料。CISCOCISCO Audit Checklist Process...First Article Inspection (FAI) - Does it contain information in form, f...

  • Milestone deliverables checklist - V6

    Milestone deliverables checklist - V6_企业管理_经管营销_专业资料。针对产品开发...First production First Article Inspection (FAI) CE declaration Approbation incl...

站点地图 | 文档上传 | 侵权投诉 | 手机版
新浪认证  诚信网站  绿色网站  可信网站   非经营性网站备案
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.xuehai.net All Rights Reserved.  email
返回顶部